Maggie’s Centre, St Bartholomew’s Hospital
Contract in Brief
Market sector
Health
Scope of works
Substructure & Superstructure
Main contractor
Sir Robert McAlpine Ltd
Engineer
Arup
Architect
J M Architects
Duration
36 weeks
Value
£1.6m
Contract start date
July 2016
Contract Summary
Works involved Construction of a single basement with a 2 storey RC frame within St Bart’s Hospital.
Basement works excavation, sheet pilings, drainage. Concrete to slab, pits, beams, walls, columns to the high tolerance requirements for the glass cladding system.
Grade 3 Waterproofing to underside of slab & walls. Design and installation of all formwork. Reinforcement and continuity reinforcement. Installation of foul water pumping chambers. Installation of in-situ concrete stairs including helical exposed concrete feature stairs.