425 Oxford St, London
Contract in Brief
Market sector
Commercial
Scope of works
Substructure & Superstructure
Main contractor
Sir Robert McAlpine
Engineer
Ramboll UK
Architect
PLP Architecture
Duration
80 weeks
Value
£4m
Contract start date
August 2017
Contract Summary
425 Oxford Street will become Adidas’ flagship Uk store.
Realtime Civil Engineering’s works included:
Sequential removal of the basement slab, drainage, 300mm waterproof concrete basement slab inclusive of pile caps, lift pits and downstands. Composite slabs to superstructure levels. Installation of Koster waterproofing system to achieve a Grade Three standard system. Visual concrete encasement to structural steel beams.