Works involved the lowering of the existing basement to both the North and South buildings. Construction of North Core to a Special finish from basement to 11th floor (13 levels). Construction of 800mm radius column, double height and single height to special finish bottom up pumped with self-compacting concrete, encasing existing 500mm square concrete encasement to steel columns.
Market sector
Commercial
Scope of works
Substructure & Superstructure
Main contractor
Sir Robert McAlpine
Engineer
AKT II
Architect
Hopkins
Duration
108 weeks
Value
£12.4m
Contract start date
September 2017
© Realtime Engineering Limited 2015 Cookie Policy | Privacy Policy | Modern Slavery & Human Trafficking Policy | Sitemap
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |